Please use this identifier to cite or link to this item:
http://www.dspace.espol.edu.ec/handle/123456789/13383
Title: | Proyecto hidrologico río chimbo |
Authors: | Orozco Coello, Danny Bermúdez, Gustavo |
Keywords: | PROYECTO HIDROLÓGICO RIO CHIMBO GENERACIÓN HIDROELÉCTRICA RECURSO HÍDRICO |
Issue Date: | 22-Oct-2010 |
Abstract: | Our country has had electric energy rationing problems, which owes to different factors; one of them is the high price of the energy, one of the highest of the region, product of the dependence on thermal generation. Another factor is the dependence on our biggest electrical generation project, Paute - Molino, which delivers a large percentage of the electric energy of our country. Despite this, in the drought months its installed capacity is missed because of the lack of water resource, it is then when energy rationing occurs. To face these problems it is necessary to boost hydroelectric projects of the basin of Guayas, which are capable of providing energy during these drought months and replacing thermoelectric energy during the rest of the year, obtaining with this to low the energy price. Particularly, this project analyzes the possibility of developing the hydroelectric plants one after another, in Chimbo River, denominated”River Chimbo Hydrologic Project”. |
URI: | http://www.dspace.espol.edu.ec/handle/123456789/13383 |
Appears in Collections: | Artículos de Tesis de Grado - FCSH |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
PROYECTO HIDROLOGICO RIO CHIMBO.doc | 365.5 kB | Microsoft Word | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.