Please use this identifier to cite or link to this item: http://www.dspace.espol.edu.ec/handle/123456789/6392
Title: Plan de continuidad de negocios (bcp) para el área de sistemas de una empresa dedicada a la manufactura de papel; por el período terminado al 31 de diciembre del 2008 en la ciudad de Guayaquil.
Authors: Sánchez, J.
Fierro, L.
Keywords: PLAN DE CONTINUIDAD DE NEGOCIO (BCP)
ANÁLISIS DE IMPACTO DEL NEGOCIO (BIA)
CORE BUSINESS
CONTINGENCIA
CONTINGENCIA
DESASTRE
AMENAZA
VULNERABILIDAD
RIESGO
BACKUP
PUNTO DE RECUPERACIÓN
TIEMPO DE RECUPERACIÓN
Issue Date: 6-Aug-2009
Abstract: This work involves research, analysis and process that must include a business continuity plan in case of contingency or disaster that affects the continuity of operations of the company Clark S.A. . The interruption of operations can be given for various reasons such as natural disasters, human, technological and operational impacts that cause severe human and economic losses occur according to the severity of the disaster in case of not having implemented a BCP. For the realization of our work we focus on analyzing the controls, policies and procedures established by management for the area of IT systems, which allowed us to plan our plan. Analyze the threats, vulnerabilities and risk in IT processes. Was determined by testing control to verify the proper functioning of the scheme, also set the recovery process of the crisis and a manual that allows the company to face any contingency. As tools for our work we relied on questionnaires, tables, charts, check lists that serve as control tools to assess the IT processes, and analysis of the plan.
URI: http://www.dspace.espol.edu.ec/handle/123456789/6392
Appears in Collections:Artículos de Tesis de Grado - ICM

Files in This Item:
File Description SizeFormat 
Plan de Continuidad de Negocios (BCP).pdf207.55 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.