Repositorio Dspace

Proyecto hidrologico río chimbo

Mostrar el registro sencillo del ítem

dc.contributor.author Orozco Coello, Danny
dc.contributor.author Bermúdez, Gustavo
dc.date.accessioned 2010-10-22
dc.date.available 2010-10-22
dc.date.issued 2010-10-22
dc.identifier.uri http://www.dspace.espol.edu.ec/handle/123456789/13383
dc.description.abstract Our country has had electric energy rationing problems, which owes to different factors; one of them is the high price of the energy, one of the highest of the region, product of the dependence on thermal generation. Another factor is the dependence on our biggest electrical generation project, Paute - Molino, which delivers a large percentage of the electric energy of our country. Despite this, in the drought months its installed capacity is missed because of the lack of water resource, it is then when energy rationing occurs. To face these problems it is necessary to boost hydroelectric projects of the basin of Guayas, which are capable of providing energy during these drought months and replacing thermoelectric energy during the rest of the year, obtaining with this to low the energy price. Particularly, this project analyzes the possibility of developing the hydroelectric plants one after another, in Chimbo River, denominated”River Chimbo Hydrologic Project”. en
dc.language.iso spa en
dc.rights openAccess
dc.subject PROYECTO HIDROLÓGICO RIO CHIMBO en
dc.subject GENERACIÓN HIDROELÉCTRICA en
dc.subject RECURSO HÍDRICO en
dc.title Proyecto hidrologico río chimbo en
dc.type Article en


Ficheros en el ítem

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Buscar en DSpace


Búsqueda avanzada

Listar

Mi cuenta