Resumen:
The purpose of this work consists in the analysis of an operative alternative that is possible for the cementing of the
CHS-3D well, the one that is in Yuca field
We determine the volume of the cement for the lead cement and tail cement, that is required
the sections of the program, we compare the design of this proposal with the actual model, and we determined that
in each section the excess of the cement vary significantly in the first two sections we will cement up to the surface
designing two cement and in the liner section we will cement with only one cement.
The results will be analyzed in a comparative form. Based on
our proposal is applicable.
It is recommended that to avoid the operational problems that could occur during the development of this work, we
must consider that the annular must be with no contaminants and that the cement is composition, volume and time
must be the adequate.