dc.description | Se analiza las condiciones de operación de 3 transformadores de distribución instalados en las ciudades de Libertad, Salinas y Santa Elena. Se estudia el comportamiento del transformador durante una semana en los meses de Octubre y Diciembre y se analizan las curvas de cargas registradas cada 15 minutos en el medidor totalizador, para luego determinar las condiciones deben presentarse para que su dimensionamiento sea el adecuado. Se determina el grado de potencia que entrega un transformador de distribución para identificar si funciona bajo condiciones de sobrecarga o de manera breve mencionar si se encuentra sobredimensionado considerando además las pérdidas que se originan en la red de distribución. Los registros de los transformadores que se van a estudiar se los obtiene de medidores totalizadores instalados en la península de Santa Elena puntualmente en los cantones de Libertad, Salinas y Santa Elena. En base a los resultados obtenidos determinamos que el transformador 1 no funciona en sobrecarga, pero si está sobredimensionado. Que el transformador 2 y 3 no se encuentra sobrecargado, pero el transformador 3 se encuentra sobredimensionado. | es_EC |
dc.description.abstract | It analyzed the operating conditions of 3 distribution transformers installed in the cities of Libertad, Salinas and Santa Elena. We study the behavior of the transformer during a week in the months of October and December and analyzed the load curves recorded every 15 minuteswith a totalizer meter,after that determinate the conditions to be submit for discussed the dimensioning appropriate. Determined the degree of power that delivers a distribution transformer to identify whether operating under overload conditions or whether this on oversize considering the losses that arise from the distribution network. The records of transformers to be studied are obtained from totalizers meters installed in the peninsula of Santa Elena promptly in the cantons of Libertad, Salinas and Santa Elena. Based on the results obtained determined that the transformer 1 is not operating in overload, but if this oversized. The transformer 2 and 3 is not overloaded, but the transformer 3 is oversized. | es_EC |
dc.language.iso | spa | es_EC |
dc.publisher | ESPOL | es_EC |
dc.rights | openAccess | es_EC |
dc.subject | Eficiencia Energética | es_EC |
dc.subject | transformador sobredimensionado | es_EC |
dc.subject | sobrecarga | es_EC |
dc.title | Determinación de la Cantidad Adecuada de Usuarios por Transformador de Potencia en Zonas de Santa Elena a Nivel de Baja Tensión Considerando Eficiencia Energética | es_EC |