Repositorio Dspace

Actualización de hardware y firmware de un sistema paralelo redundante de UPS ’s Eaton 9390 de capacidad 120 KVA

Mostrar el registro sencillo del ítem

dc.contributor.author Reyes Bunay, Jose Benjamin
dc.date.accessioned 2015-12-11T13:26:06Z
dc.date.available 2015-12-11T13:26:06Z
dc.date.issued 2015-12-07
dc.identifier.uri http://www.dspace.espol.edu.ec/xmlui/handle/123456789/31300
dc.description En este proyecto se tiene por objeto realizar la actualización tanto en tarjetas (hardware) y programa ejecutable (firmware) de un sistema paralelo redundante de UPS ’s Eaton modelos 9390 de 120 KVA del cliente Almacenes de Prati. El sistema paralelo suministra energía regulada a todo el centro de cómputo así como a todos los usuarios del edificio Aldijo-matriz ubicado en Luque 317 y Boya cá. Este proyecto está enfocado en solventar la respuesta no adecuada por parte del sistema paralelo redundante frente a ciertos tipos de variaciones de la empresa eléctrica producidos en horas de la madrugada y feriados. La presencia de estas variaciones de la empresa eléctrica en las circunstancias antes indicadas daba como resultado el apagado de todo el Sistema Paralelo Redundante (SPR), dicho comportamiento tuvo inicio en enero del 2013 hasta el 31 de diciembre del mismo año. Por lo antes expuesto y con la finalidad de contar con un sistema de UPS ’s que responda de manera adecuada a las variaciones de la empresa eléctrica se realizó un estudio a detalle de cada una de las unidades así como de monitorear el suministro de energía para determinar la causa que ocasiona el apagado del sistema ante un disturbio de empresa eléctrica. es_EC
dc.description.abstract This project the goal is to perform the update on cards (hardware) and executable programs (firmware) from a Parallel Redundant System of 120 KVA 9390 Eaton UPS of the client Almacenes De Prati. Parallel System provides regulated energy to the data center and all the users in the building Aldijo-Matriz located on Luque 317 y Boyacá. This Project is focused on provide a non-proper answer from the Parallel Redundant System in front of several types of energy variation of the Electrical Company on situations such as the middle of the night and holidays. The presence of the variations from the Electrical Company on circumstances named before gave as a result the shutdown of the Parallel Redundant System (PRS), this behavior began on January 31st 2013 up until December 31st 2013. By the reasons exposed earlier and with the goal of counting on a UPS’s System that responds properly to the variations from Electric Company a detailed study was preform on every unit and monitored the power supply to determinate the cause that produced the shutdown on the system in front of a disturbance from the Electric Company. es_EC
dc.language.iso spa es_EC
dc.publisher ESPOL es_EC
dc.rights openAccess es_EC
dc.subject sistema paralelo redundante es_EC
dc.subject actualización es_EC
dc.subject hardware es_EC
dc.subject firmware es_EC
dc.title Actualización de hardware y firmware de un sistema paralelo redundante de UPS ’s Eaton 9390 de capacidad 120 KVA es_EC
dc.type Article es_EC


Ficheros en el ítem

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Buscar en DSpace


Búsqueda avanzada

Listar

Mi cuenta