“DISEÑO DE UN CENTRO DE PROCESAMIENTO DE DATOS, DE APROXIMADAMENTE 1000 M2, PARA CERTIFICACIÓN TIER II”

Show simple item record

dc.contributor.author CEDEÑO LÓPEZ, MARIBEL ROSSANA
dc.contributor.author QUEZADA PEÑA, JESÚS EDUARDO
dc.date.accessioned 2018-06-25T15:21:20Z
dc.date.available 2018-06-25T15:21:20Z
dc.date.issued 2016-09-08
dc.identifier.uri http://www.dspace.espol.edu.ec/xmlui/handle/123456789/43775
dc.description El documento se realizó con el fin de determinar el diseño de una implementación adecuada para un centro de procesamiento de datos que disponga de un plan de contingencia para diferentes circunstancias como perdidas de información, caída de enlace, riesgos por desastres naturales. Para obtener la viabilidad del funcionamiento del mismo. Como primer paso para alcanzar los objetivos propuestos se realizó un análisis, diseño e implementación de una infraestructura data center que avalen su disponibilidad y continuidad en base a estándares determinados que permiten que dicha infraestructura sea de fácil administración, segura, escalable, confiable, ya que tendrá tecnologías que garanticen una adecuada gestión de comunicación justificando las necesidades de la empresa. Con todo lo detallado se evaluó las soluciones más considerables con la más alta tecnología para los sistemas eléctricos, seguridad, monitoreo, iluminación, telecomunicaciones. A su vez se estableció costos actuales para la implementación de los mismos y así servir como modelo para ser implementado en otros centros de procesamiento de datos que aspiren tener una certificación TIER 2 en Ecuador. es_EC
dc.description.abstract The document was conducted in order to determine the design of a suitable implementation for a data center that has a contingency plan for different circumstances such as loss of information, drop link, risks from natural disasters. For the feasibility of operation. As a first step to achieve the objectives analysis, design and implementation of infrastructure data center to support its availability and continuity based on certain standards that allow such infrastructure is easily managed, secure, scalable, reliable, was performed as technologies will ensure proper management of communication justifying the needs of the company. With all detailed the most significant solutions with the latest technology for electric systems, security, monitoring, lighting, telecommunications evaluated. Turn actual costs to implement them was established and thus serve as a model to be implemented in other data processing centers that aspire to have a TIER 2 certification in Ecuador. es_EC
dc.language.iso spa es_EC
dc.publisher ESPOL es_EC
dc.rights openAccess es_EC
dc.subject diseño es_EC
dc.subject análisis es_EC
dc.subject implementación es_EC
dc.subject data center es_EC
dc.title “DISEÑO DE UN CENTRO DE PROCESAMIENTO DE DATOS, DE APROXIMADAMENTE 1000 M2, PARA CERTIFICACIÓN TIER II” es_EC
dc.type Article es_EC