Mostrar el registro sencillo del ítem
dc.contributor.author | Sánchez Velásquez, Oswaldo Roberto | |
dc.contributor.author | Tapia F., Daniel | |
dc.date.accessioned | 2009-08-06 | |
dc.date.available | 2009-08-06 | |
dc.date.issued | 2009-08-06 | |
dc.identifier.uri | http://www.dspace.espol.edu.ec/handle/123456789/6397 | |
dc.description.abstract | The objective of this paper consist in a completion system design for oil wells in Oglan Field, which is placed in Pastaza-Ecuador, involving information about reservoir, fluids, well profile, production index as well as analyze and measure mechanical factors which affects tubing string movements and well equipment in the different scenarios of production and operation. We use some softwares to do this such as: TUBEMOVE for string movement,TORQUE&DRAG to measure the frictional forces, AUTOGRAPH, determine the appropriate ESP System to used. This softwares belongs to Baker Hughes. | en |
dc.language.iso | spa | en |
dc.rights | openAccess | |
dc.subject | TORQUE | en |
dc.subject | ARRASTRE | en |
dc.subject | EQUIPO BES | en |
dc.title | Sistema de completación recomendado para desarrollo de pozos en el campo oglan | en |
dc.type | Article | en |