dc.contributor.author |
Carangui Rodríguez, Juan José |
|
dc.contributor.author |
González Tello, Cristhian Raúl |
|
dc.contributor.author |
Sánchez Ortega, Nelson Alfredo, Director |
|
dc.date.accessioned |
2025-04-28T19:31:53Z |
|
dc.date.available |
2025-04-28T19:31:53Z |
|
dc.date.issued |
2025-02-05 |
|
dc.identifier.citation |
Carangui Rodríguez J.J. y González Tello C.R. (2024). Planificación interoperable de la construcción del Edificio “Mirador del Valle”, mediante gestión colaborativa con tecnología 4D (SYNCHRO – SMARTSHEET). [Proyecto de Graduación]. Escuela Superior Politécnica del Litoral. |
es_EC |
dc.identifier.uri |
http://www.dspace.espol.edu.ec/handle/123456789/65866 |
|
dc.description |
Este proyecto tuvo como finalidad establecer una planificación interoperable para la
construcción del edificio "Mirador del Valle", ubicado en Azogues, Ecuador. Se
implementaron metodologías BIM y tecnologías 4D con el propósito de optimizar los
procesos constructivos. La hipótesis planteada sostiene que el uso de un modelo
colaborativo que combine BIM y herramientas como SYNCHRO y Smartsheet
permite mejorar la coordinación y la gestión en las etapas del proyecto. Su relevancia
radica en la necesidad de resolver problemas recurrentes de comunicación y
eficiencia en el sector de la construcción.
En su desarrollo, se elaboraron modelos tridimensionales utilizando la metodología
BIM, integrando datos arquitectónicos, estructurales e hidrosanitarios. Estos modelos
se vincularon con un cronograma de planificación 4D mediante SYNCHRO. Además,
se cumplieron estrictamente las normativas locales y estándares internacionales,
mientras que Smartsheet se empleó para facilitar una gestión colaborativa efectiva.
El análisis permitió identificar y solucionar conflictos durante las fases de diseño y
construcción, asegurando el cumplimiento de los plazos establecidos y el
presupuesto asignado.
Los resultados reflejan el éxito de la implementación de un modelo 4D interoperable,
con mejoras significativas en la planificación y la coordinación entre los equipos de
trabajo. La planificación contribuyó a prever y minimizar riesgos durante el proceso
constructivo, aumentando así la eficiencia general del proyecto.
En conclusión, la integración de metodologías BIM y tecnologías 4D promueve la
sostenibilidad y mejora la productividad en los proyectos de construcción, marcando
un referente para futuras iniciativas en Ecuador |
es_EC |
dc.description.abstract |
This project aimed to establish an interoperable planning system for constructing the
"Mirador del Valle" building in Azogues, Ecuador. BIM methodologies and 4D
technologies were implemented to optimize construction processes. The proposed
hypothesis suggests that using a collaborative model combining BIM and tools like
SYNCHRO and Smartsheet significantly improves coordination and project
management. Its importance lies in addressing recurring issues of communication
and efficiency in the construction sector.
During its development, three-dimensional models were created using BIM
methodology, integrating architectural, structural, and hydrosanitary data. These
models were linked to a 4D planning schedule through SYNCHRO. Local regulations
and international standards were strictly adhered to, while Smartsheet was employed
to facilitate effective collaborative management. The analysis identified and resolved
conflicts in the design and construction phases, ensuring compliance with established
deadlines and budget constraints.
The results demonstrated the successful implementation of an interoperable 4D
model, with significant improvements in planning and coordination among work
teams. Planning helped anticipate and mitigate risks during the construction process,
thereby enhancing the overall efficiency of the project.
In conclusion, integrating BIM methodologies and 4D technologies promotes
sustainability and enhances productivity in construction projects, setting a benchmark
for future initiatives in Ecuador.
Keywords: BIM, 4D planning, collaborative management, interoperability |
es_EC |
dc.language.iso |
es |
es_EC |
dc.publisher |
ESPOL.FICT |
es_EC |
dc.subject |
BIM |
es_EC |
dc.subject |
Planificación 4D |
es_EC |
dc.subject |
Gestión colaborativa |
es_EC |
dc.subject |
Interoperabilidad |
es_EC |
dc.title |
Planificación interoperable de la construcción del Edificio “Mirador del Valle”, mediante gestión colaborativa con tecnología 4D (SYNCHRO – SMARTSHEET) |
es_EC |
dc.type |
Thesis |
es_EC |
dc.identifier.codigoespol |
T-115160 |
|
dc.identifier.codigoproyectointegrador |
POSTG155 |
|