Repositorio Dspace

Diseño de completación dual concéntrica bes- fn para casing de 9 5/8

Mostrar el registro sencillo del ítem

dc.contributor.author Soto Almeida, Joao Carlos
dc.contributor.author Salazar Serrano, Carlos Patricio
dc.date.accessioned 2009-11-06
dc.date.available 2009-11-06
dc.date.issued 2009-11-06
dc.identifier.uri http://www.dspace.espol.edu.ec/handle/123456789/8021
dc.description.abstract The purpose for this project is to develop a dual concentric completion where we´re going to produce two stratus. The sand “U down” will produce using ESP due to the characteristics of the fluid and the production level. The sand “Upper Hollin” will be produced using Natural Flow because the reservoir characteristics. It covers the petrophysics characteristics, the properties of the fluids, a geological resume about the Amazonian region and the basins, so that will help to understand the lithology and the reservoir shape where the completion will be designed. There is an explanation and description about the dual completion systems and tools needed to design it. This also shows a detailed description of the bottom hole assembly, the procedures and the criterions for selecting the tool and all the equipments according of the characteristics of the well and the reservoir. The final part has a detailed analysis of all the expenses such as: tool, equipments, rent of rig, operation cost, installation cost, etc. there is also a analysis cost-benefit and show the IRR and NPV which help us to know that our project is profitable. en
dc.language.iso spa en
dc.rights openAccess
dc.subject BOMBEO ELECTROSUMERGIBLE en
dc.subject COMPLETACION DUAL en
dc.subject BES - FN en
dc.title Diseño de completación dual concéntrica bes- fn para casing de 9 5/8 en
dc.type Article en


Ficheros en el ítem

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Buscar en DSpace


Búsqueda avanzada

Listar

Mi cuenta