dc.description.abstract |
This work aims seeks to achieve a suitable estimation and production control laws, using geostatistical
technologies, to determine a reliable procedure of taking and preparation of detrituses of perforation generated in
the quarry; as a correct interpolation method for the assignment of the law of a blast. The study area is located in
the mining area CENACA to the Northwest of the city of Guayaquil; on the southern slope of the mountain chain
Chongón-Colonche (is part of the Chongón-Colonche mountain range). For the development of research, we
determined and quantified the mistake of sampling inside the current procedure of capture and preparation of
sample, then setting the maximum sampling error based on production requirements, establish an appropriate
procedure, then determined the best interpolation to estimate the percentage of SiO2 and SO3 a blast, using, the
Mean Absolute Error (MAE) and the Mean Square Error (MSE) as precision measurements, also as a goodness of
fit measurement, the prediction |
en |