Please use this identifier to cite or link to this item: http://www.dspace.espol.edu.ec/handle/123456789/11026
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMiranda Alcívar, Santos Francisco-
dc.contributor.authorProaño Cadena, Gastón-
dc.date.accessioned2010-07-12-
dc.date.available2010-07-12-
dc.date.issued2010-07-12-
dc.identifier.urihttp://www.dspace.espol.edu.ec/handle/123456789/11026-
dc.description.abstractThe project aims to study the improvement of the oil production at Tetete field by drilling new production wells in the lower “U” sand. Based on seismic data, well log analysis, previous analysis and historical production data, a three-dimensional model of the reservoir was created using the software Flogrid (static model) and the software Eclipse Office (dynamic model). After verifying that the model created reflected the behavior of field production from the beginning of the operation in 1984 to the current date (June 2010), there was performed a production forecast to June 2025. In the stage of forecast, and considering the petrophysical variables of the model, the location and the appropriate number of wells to be drilled to improve the production of this field were determinate, establishing a relationship between the variables mentioned above and the additional oil production could be obtained, but also taking into account that the water cut does not exceed the economical limit.en
dc.language.isospaen
dc.rightsopenAccess-
dc.subjectSIMULACIÓN NUMÉRICA DE YACIMIENTOS DE HIDROCARBUROSen
dc.subjectPRODUCCIÓN DE PETRÓLEO.en
dc.titleEstudio de mejora de la producción del campo tetete (Ecuador)en
dc.typeArticleen
Appears in Collections:Artículos de Tesis de Grado - FICT

Files in This Item:
File Description SizeFormat 
Estudio de mejora de la Producción del Campo Tetete (Ecuador).pdf244.26 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.