Please use this identifier to cite or link to this item: http://www.dspace.espol.edu.ec/handle/123456789/31272
Full metadata record
DC FieldValueLanguage
dc.contributor.authorChang Vergara, Eduardo Javier-
dc.date.accessioned2015-12-06T23:11:21Z-
dc.date.available2015-12-06T23:11:21Z-
dc.date.issued2015-11-
dc.identifier.urihttp://www.dspace.espol.edu.ec/xmlui/handle/123456789/31272-
dc.descriptionEl proyecto de auditoría energética eléctrica se desarrolló en función de la metodología aplicada. Esta metodología comprende cinco etapas que son las siguientes:  Primera etapa: Reunir datos técnicos sobre el edificio.  Segunda etapa: Mediciones y toma de datos relevantes del sistema eléctrico de la edificación.  Tercera etapa: Diagnóstico del edificio. En base a la toma de datos se obtienen los resultados de dichas mediciones y se realiza un levantamiento de cargas complementándolo con el análisis técnico del historial de facturación eléctrica.  Cuarta etapa: Identificación de las mejoras energéticas más importantes. Su importancia está en función del ahorro energético que se obtendrá al aplicar las propuestas técnicas planteadas.  Quinta etapa: Viabilidad económica de las propuestas de ahorro energético analizadas. Es necesario demostrar que efectivamente tales propuestas tendrán beneficios económicos y que su inversión podrá ser recuperada en un tiempo prudencial. Es necesario recalcar que se encontraron algunas anomalías eléctricas, pero considerando los costos de inversión, el porcentaje de energía desperdiciada y el impacto que pudiera tener a futuro en las instalaciones eléctricas, se identificaron dos focos potenciales de ahorro energético como son el “filtrado de armónicos” y “aumento del factor de potencia”.es_EC
dc.description.abstractThe electric energy audit project was developed based on the methodology applied. The methodology comprises five stages are:  First stage: Collecting technical data on the building.  Second step: take measurements and relevant data of the electrical system of the building.  Third stage: Diagnosis of the building. Based on data collection results of these measurements are obtained and lifting loads supplemented by technical analysis utility billing history is made.  Fourth stage: Identification of the most important energy improvements. Its importance is based on the energy savings will be obtained by applying the technical proposals submitted.  Fifth stage: Economic viability of energy saving proposals analyzed. It is necessary to show that such proposals will effectively economic benefits and that your investment will be recovered within a reasonable time. It should be emphasized that some electrical faults found, but considering the investment costs, the percentage of wasted energy and the impact it could have in the future in electrical installations, two potential sources of energy savings were identified as are the "harmonic filtering "and" increasing the power factor "es_EC
dc.language.isospaes_EC
dc.publisherESPOLes_EC
dc.rightsopenAccesses_EC
dc.subjectAuditoría Energéticaes_EC
dc.subjectCorrección del Factor de Potenciaes_EC
dc.subjectReducción del Tercer Armónicoes_EC
dc.subjectPérdidas por Efecto Joulees_EC
dc.titleAUDITORÍA ENERGÉTICA ELÉCTRICA DE UN EDIFICIO PÚBLICOes_EC
dc.typeArticlees_EC
Appears in Collections:Artículos de Tesis de Grado - FIEC

Files in This Item:
File Description SizeFormat 
AUDITORÍA ENERGÉTICA ELÉCTRICA DE UN EDIFICIO PÚBLICO.pdf68.77 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.