Please use this identifier to cite or link to this item:
http://www.dspace.espol.edu.ec/handle/123456789/3215
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Alarcón, Rafael, Director | es_ES |
dc.contributor.author | Chico Soto, Elvira | es_ES |
dc.contributor.author | Lindao Colobon, Efraín | es_ES |
dc.contributor.author | Vargas Soto, Juan | es_ES |
dc.date.accessioned | 2003-01-05 | es_ES |
dc.date.accessioned | 2009-03-10 | - |
dc.date.available | 2003-01-05 | es_ES |
dc.date.available | 2009-03-10 | - |
dc.date.issued | 2003 | es_ES |
dc.identifier.uri | http://www.dspace.espol.edu.ec/handle/123456789/3215 | - |
dc.description.abstract | ESTE TRABAJO MUESTRA DE MANERA GENERAL LOS SISTEMAS DE CONTROL DE LA CENTRAL TERMOELECTRICA MACHALA POWER EN SU PRIMERA FASE DE CONSTRUCCION. DESCRIBE EL FUNCIONAMIENTO DE LA UNIDAD TURBINA GENERADOR Y LOS SISTEMAS QUE COMPONEN LA PLANTA, ASI COMO LA INSTRUMENTACION UTILIZADA EN LA MISMA. ADEMAS PRESENTA LOS SISTEMAS DE CONTROL IMPLEMENTADOS A PARTIR DE LA TECNOLOGIA DIGITAL. EL BOP (BALANCE OF PLANTA) ES CONTROLADO POR EL SISTEMA SYMPHONY DE ABB Y LAS UNIDADES TURBINA GENERADOR Y SUS SISTEMAS AUXILIARES SON CONTROLADOS POR EL SPEEDTRONIC MARK V DE GENERAL ELECTRIC. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | ESPOL. FIEC | - |
dc.rights | openAccess | - |
dc.subject | SISTEMAS, TERMOELECTRICA, CONSTRUCCION | es_ES |
dc.title | Sistemas de control de la central termoeléctrica Machala Power | es_ES |
dc.type | bachelorThesis | es_ES |
dc.description.city | Guayaquil | - |
Appears in Collections: | Tesis de Electricidad |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.