Please use this identifier to cite or link to this item: http://www.dspace.espol.edu.ec/handle/123456789/6397
Title: Sistema de completación recomendado para desarrollo de pozos en el campo oglan
Authors: Sánchez Velásquez, Oswaldo Roberto
Tapia F., Daniel
Keywords: TORQUE
ARRASTRE
EQUIPO BES
Issue Date: 6-Aug-2009
Abstract: The objective of this paper consist in a completion system design for oil wells in Oglan Field, which is placed in Pastaza-Ecuador, involving information about reservoir, fluids, well profile, production index as well as analyze and measure mechanical factors which affects tubing string movements and well equipment in the different scenarios of production and operation. We use some softwares to do this such as: TUBEMOVE for string movement,TORQUE&DRAG to measure the frictional forces, AUTOGRAPH, determine the appropriate ESP System to used. This softwares belongs to Baker Hughes.
URI: http://www.dspace.espol.edu.ec/handle/123456789/6397
Appears in Collections:Artículos de Tesis de Grado - FICT



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.