Please use this identifier to cite or link to this item:
http://www.dspace.espol.edu.ec/handle/123456789/65909
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Rivera Mejía, Jenny Estefanía | - |
dc.contributor.author | Muñoz, Guillermo, Director | - |
dc.date.accessioned | 2025-05-05T17:20:03Z | - |
dc.date.available | 2025-05-05T17:20:03Z | - |
dc.date.issued | 2025-04-30 | - |
dc.identifier.citation | Rivera Mejía J.E. (2024). Renovación integral de la cubierta y modernización de las instalaciones sanitarias del edificio 3k CIBE para la mejora de la operatividad y seguridad [Proyecto Integrador]. Escuela Superior Politécnica del Litoral. | es_EC |
dc.identifier.uri | http://www.dspace.espol.edu.ec/handle/123456789/65909 | - |
dc.description | El presente proyecto plantea el rediseño de la cubierta y la mejora del uso de recursos en el edificio 3K de ESPOL, incluyendo la recolección de aguas lluvias, una cubierta termorresistente y el reemplazo de muebles sanitarios, además de la restauración del exterior afectado por humedad. La cubierta actual presenta material perjudicial para la salud, mientras que los puntos de humedad afectan la infraestructura; estas intervenciones buscan optimizar la seguridad operativa, el consumo energético y de agua potable. Se realizaron inspecciones para evaluar el estado de la cubierta y las áreas afectadas por humedad. Tras analizar diversas alternativas, se seleccionó una cubierta termorresistente para disminuir la transferencia de calor al interior. El diseño estructural de la cubierta se realizó conforme a la NEC 2015, y las instalaciones de drenaje pluvial y recolección de aguas lluvias bajo la NHE. Adicionalmente, se elaboró un preestudio que identificó una eficiencia energética del 19 % y una mejora del 49 % en la gestión de agua. El diseño integra el uso eficiente de recursos dentro de los límites presupuestarios de una institución pública, garantizando soluciones viables para el edificio | es_EC |
dc.description.abstract | This project involves the redesign of the roof and improved use of resources in ESPOL's 3K building, including rainwater harvesting, a heat-resistant roof, and replacement of sanitary furniture, as well as the restoration of the outside affected by moisture. The current roof has material harmful to health, while the moisture points affect the infrastructure; these interventions seek to optimize operational safety, energy and drinking water consumption. Inspections were carried out to assess the condition of the deck and areas affected by moisture. After considering various alternatives, a heat-resistant cover was selected to reduce the transfer of heat into the building. NEC 2015 was used to design the roof, and NHE was used to design the rainwater drainage and collection facilities. In addition, a pre-study was carried out which identified an energy efficiency of 19% and a 49% improvement in water management. The design integrates resource efficiency within the budgetary limits of a public institution, ensuring viable solutions for the building. Keywords: Heat-resistant roof, rainwater harvesting, energy efficiency, infrastructure restoration | es_EC |
dc.language.iso | es | es_EC |
dc.publisher | ESPOL.FICT | es_EC |
dc.subject | cubierta termorresistente | es_EC |
dc.subject | recolección de aguas lluvias | es_EC |
dc.subject | eficiencia energética | es_EC |
dc.subject | restauración de infraestructura | es_EC |
dc.title | Renovación integral de la cubierta y modernización de las instalaciones sanitarias del edificio 3k CIBE para la mejora de la operatividad y seguridad | es_EC |
dc.type | Thesis | es_EC |
dc.identifier.codigoespol | T-115195 | - |
dc.identifier.codigoproyectointegrador | INGE-2691 | - |
Appears in Collections: | Tesis de Ingeniería Civil |
Files in This Item:
File | Size | Format | |
---|---|---|---|
T-115195 INGE-2691 RIVERA JENNY.pdf | 8 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.