Please use this identifier to cite or link to this item: http://www.dspace.espol.edu.ec/handle/123456789/67897
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMoyano Zambrano, Steven Gerardo-
dc.contributor.authorTenempaguay Palate, Mauricio Darío-
dc.contributor.authorBucaram Carbo, Carlos Javier, Director-
dc.date.accessioned2026-03-06T20:39:25Z-
dc.date.available2026-03-06T20:39:25Z-
dc.date.issued2025-
dc.identifier.citationMoyano Zambrano S.G; Tenempaguay Palate M.D. (2025) Diseño conceptual de un sistema de precalentamiento de agua blanda de alimentación para caldera pirotubular [Proyecto Integrador] Escuela Superior Politécnica del Litorales_EC
dc.identifier.urihttp://www.dspace.espol.edu.ec/handle/123456789/67897-
dc.descriptionCONDICIMIENTO DE PUBLICACION DE PROYECTO. La creciente demanda energética de los sectores industrializados de cada país conlleva a buscar medidas que economicen la generación de energía en plantas químicas a través del aprovechamiento de las fuentes residuales como los gases de combustión. El presente proyecto se basó en una caldera pirotubular de alimentación intermitente del Laboratorio de Operaciones Unitarias de la ESPOL. La necesidad de incrementar la temperatura del agua de ingreso a la caldera derivó en la idea de diseñar conceptualmente un economizador con forma de banco de tuberías que recupere la energía residente en los humos resultantes de la combustión de Diésel 2. El diseño final del economizador resultó en 28 tubos distribuidos en 7 filas y 4 columnas dentro de una coraza con un largo de 50 cm, ancho de 21.1 cm y altura de 40 cm, que permitirá incrementar la temperatura del agua desde 27°C a 50°C, reduciendo hasta 80°C la temperatura del flujo de gases que inicialmente escapan a 305°C. Se validó el diseño usando el software Aspen HYSYS® obteniendo un ahorro máximo de diésel de 0.18 gal/h, reducción del flujo de gases hasta en un 8%, y un periodo de retorno de inversión de 5 años y 7 meses.es_EC
dc.description.abstractPROJECT PUBLICATION CONDITIONS. The growing energy demand of the industrialized sectors in each country leads to the search for measures to make energy generation more efficient in chemical plants by taking advantage of residual sources such as flue gases. This project was based on a fire-tube boiler with intermittent feed from the Unit Operations Laboratory at ESPOL. The need to increase the temperature of the water entering the boiler led to the conceptual design of an economizer, shaped as a bank of pipes, to recover the energy remaining in the fumes resulting from the combustion of Diesel 2. The final design of the economizer consisted of 28 tubes arranged in 7 rows and 4 columns inside a shell measuring 50 cm in length, 21.1 cm in width, and 40 cm in height. This setup allows the incoming water temperature to be increased from 27°C to 50°C, while reducing the gas flow temperature to 80°C from the initial 305°C. The design was validated using Aspen HYSYS® software, achieving a maximum diesel savings of 0.18 gal/h, a reduction in gas flow of up to 8%, and a payback period of 5 years and 7 months. KEYWORDS: Economizer, Aspen HYSYS, heat transfer, fuel, fire-tube boiler.es_EC
dc.publisherESPOL.FCNMes_EC
dc.subjectEconomizadores_EC
dc.subjectCaldera pirotubulares_EC
dc.subjectAspen HYSYes_EC
dc.subjectTransferencia de calores_EC
dc.subjectCaldera pirotubulares_EC
dc.subjectCombustiblees_EC
dc.titleDiseño conceptual de un sistema de precalentamiento de agua blanda de alimentación para caldera pirotubulares_EC
dc.typeThesises_EC
dc.identifier.codigoespolT-115786-
dc.identifier.codigoproyectointegradorINGE-2883-
Appears in Collections:Tesis de Ingeniería Química

Files in This Item:
File Description SizeFormat 
T-115786 INGE-2883 MOYANO-TENEMPAGUAY.pdf5.51 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.