Por favor, use este identificador para citar o enlazar este ítem: http://www.dspace.espol.edu.ec/handle/123456789/10848
Título : Diseño de un sistema de control de gestión, basado en el balanced scorecard en una empresa manufacturera, en la ciudad de Guayaquil año 2009
Autor : Sánchez, Teófilo
Zambrano, Lourdes
Lozada, Jaime
Palabras clave : BALANCED SCORECARD
INDICADORES
GESTIÓN.
Fecha de publicación : 30-jun-2010
Resumen : The present document will contain a design of a Management Control System, based on the Balanced ScoreCard into a producer, packer and distributor tuna enterprise, located in Guayaquil city during the period 2009. The principal objective is to develop the documents of the main indicators of the human resources process´s, to use them in the taking of decision., At the end, the conclusions and recommendations obtained after analyze the information previously mentionated, will be included, in that way, the management will take the appropriate decisions to keep a good control of the different process to continue without troubles with the normal activities in the enterprise.
URI : http://www.dspace.espol.edu.ec/handle/123456789/10848
Aparece en las colecciones: Artículos de Tesis de Grado - ICM

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Diseño de un Sistema de Control de Gestión.pdf258.13 kBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.