Por favor, use este identificador para citar o enlazar este ítem: http://www.dspace.espol.edu.ec/handle/123456789/4850
Título : Desarrollo de un plan de continuidad del negocio de una empresa industrial productora de electrodos, en el área de producción, en la ciudad de Guayaquil, para el período 2009
Autor : Soledispa, C.
Reyes, Rene
Palabras clave : PLAN DE CONTINUIDAD DEL NEGOCIO
Fecha de publicación : 20-abr-2009
Resumen : Constantly, we experience emergency situations, directly or indirectly, in companies, which need immediate response. The Business Continuity Plan (BCP) will help us to establish what we must do to ensure the survival of a company or institution in case it would be subjected to an unwanted interruption of business or operation. This article shows the results of the work whose main objective is to find the best way to minimize the harmful effects that a disruption can produced. Having a Business Continuity Plan and implement it in an immediate and controlled way will let us to make the business continues in order to offer its services either completely or with a minimum guarantee. That is why the development of this work is focused on developing a Business Continuity Plan (BCP) in a company that produces electrodes, in which we will to analyze the areas of Human Resources, Information Systems and Infrastructure: specifically the Area Production.
URI : http://www.dspace.espol.edu.ec/handle/123456789/4850
Aparece en las colecciones: Artículos de Tesis de Grado - ICM

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
7592.pdf307.25 kBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.