Title: Diseño Estructural de un Reservorio de agua para áreas verdes en ESPOL, Campus Gustavo Galindo
Authors: Hurtares, Walter, Director
Quinde Yépez, Héctor Omar
Tenempaguay Borja, Emmanuel Elías
Keywords: Reservorio subterráneo
Riesgo
Estudio geotécnico
Impacto ambiental
Issue Date: 2024
Publisher: ESPOL.FICT
Citation: Quinde Yépez, H. O. y Tenempaguay Borja, E. E. (2024). Diseño Estructural de un Reservorio de agua para áreas verdes en ESPOL, Campus Gustavo Galindo. [Proyecto Integrador]. ESPOL.FICT .
Description: El presente proyecto detalla el diseño estructural de un reservorio subterráneo destinado al riego de áreas verdes en el Campus Gustavo Galindo de la Escuela Superior Politécnica del Litoral (ESPOL). La necesidad de un reservorio que permita almacenar agua para riego surge debido a las pérdidas económicas asociadas con la dependencia de fuentes externas de agua. Esto ha llevado a la decisión de adaptar el agua tratada de la planta de tratamiento de ESPOL para su uso en el riego de las zonas verdes del campus. Para llevar a cabo el diseño del reservorio, se aplicaron diversas normativas, tanto nacionales como internacionales, incluyendo la ACI 350, ACI 318 y la NEC 2015. Estas normativas fueron fundamentales para el análisis estático y dinámico del reservorio. Además, se utilizó el software SAP2000 para modelar las fuerzas y dimensionar los elementos estructurales, determinando así el acero necesario para cada componente. Los planos estructurales fueron elaborados con el software Revit. Antes del análisis estructural, se realizó un estudio geotécnico para asegurar la estabilidad del talud cercano al sitio del reservorio. El estudio determinó que no existe riesgo de deslizamiento, ya que el factor de seguridad calculado mediante el programa Slide fue superior a 1.5, cumpliendo con los requisitos de seguridad establecidos por la NEC. Asimismo, se llevó a cabo un análisis de impacto ambiental, identificando que el principal problema es la pérdida de vegetación y fauna en la zona. Sin embargo, se concluyó que este impacto puede ser reversible mediante la implementación de medidas correctivas adecuadas. Finalmente, se estimó un presupuesto referencial de $139 mil dólares para la construcción del reservorio subterráneo y un periodo de construcción de 125 días. Este resumen refleja el enfoque integral del proyecto, que combina aspectos técnicos, geotécnicos y ambientales para garantizar una solución sostenible y eficiente para el riego en el campus. Palabras Clave: Reservorio subterráneo, riesgo, estudio geotécnico, impacto ambiental
metadata.dc.description.abstractenglish: This project details the structural design of a subway reservoir for the irrigation of green areas at the Gustavo Galindo Campus of the Escuela Superior Politécnica del Litoral (ESPOL). The need for a reservoir to store water for irrigation arises due to the economic losses associated with dependence on external water sources. This has led to the decision to adapt the treated water from the ESPOL treatment plant for use in irrigating the campus green areas. To carry out the design of the reservoir, various regulations, both national and international, were applied, including ACI 350, ACI 318 and NEC 2015. These standards were fundamental for the static and dynamic analysis of the reservoir. In addition, SAP2000 software was used to model the forces and dimension the structural elements, thus determining the steel required for each component. Structural drawings were prepared using Revit software. Prior to the structural analysis, a geotechnical study was performed to ensure the stability of the slope near the reservoir site. The study determined that there was no risk of landslide, since the safety factor calculated using the Slide program was greater than 1.5, complying with the safety requirements established by the NEC. An environmental impact analysis was also carried out, identifying that the main problem is the loss of vegetation and fauna in the area. However, it was concluded that this impact can be reversible through the implementation of appropriate corrective measures. Finally, a reference budget of $139 thousand dollars was estimated for the construction of the subway reservoir and a construction period of 125 days. This summary reflects the comprehensive approach of the project, which combines technical, geotechnical and environmental aspects to ensure a sustainable and efficient solution for irrigation on the campus. Key words: subway reservoir, risk, geotechnical study, environmental impact
URI: http://www.dspace.espol.edu.ec/handle/123456789/63142
metadata.dc.identifier.codigoproyectointegrador: INGE-2563
Appears in Collections:Tesis de Ingeniería Civil

Files in This Item:
File SizeFormat 
T-114774 INGE-2563 Héctor Quinde-Emmanuel Tenempaguay.pdf15.91 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.